
The demonstrator is taking on its final form
Our 1.2 MW PEM electrolysiser demonstrator is taking on its final form. The modern design is gradually transforming the functional prototype into a finished product.

Our 1.2 MW PEM electrolysiser demonstrator is taking on its final form. The modern design is gradually transforming the functional prototype into a finished product.

In collaboration with the Engineering Test Institute, we are continuing the certification process for our 1.2 MW PEM electrolyzer demonstrator.

Our PEM electrolyser demonstrator has reached another important milestone. During testing at a power output of up to 200 kW, we produced more than 300 kilograms of hydrogen.

We are now planning the official unveiling of our 1.2 MW PEM electrolyzer demonstrator for early 2027. We have decided to allow more time for development so that we can present the technology in a form we fully stand behind.

From May 19 to 21, 2026, we participated in the World Hydrogen Summit & Exhibition 2026 in Rotterdam, one of the world’s leading events dedicated

On Thursday, May 21, 2026, at 3:23 PM, the NANO Advanced project reached a major milestone. Our fully assembled demonstrator successfully generated its first hydrogen

The development of the prototype containerized system for green hydrogen production has reached its final design. The project is now at a stage where completion

Representatives of the Korean company Elchemtech, which developed the electrolytic stacks for our generator prototype, visited NANO Advanced to carry out the final inspection before

After more than a year of intensive and highly specialized development, key components for hydrogen production have arrived at NANO Advanced — electrolytic stacks, which